L3 Extension Montbau - Canyelles

Open 21 September 2001

Total length - 2.4 km
3 stations: Mundet, Valldaura, Canyelles
Cost: 14,000,000,000 pesetas (84 mln euros)

Station design by Ventura Valcarce (Mundet), Manel Sánchez (Valldaura) and Alfons Soldevilla (Canyelles).

Mundet

Mundet © UrbanRail.Net Mundet © UrbanRail.Net Mundet © UrbanRail.Net Mundet © UrbanRail.Net Mundet © UrbanRail.Net

Valldaura

Valldaura © UrbanRail.Net Valldaura © UrbanRail.Net Valldaura © UrbanRail.Net Valldaura © UrbanRail.Net Valldaura © UrbanRail.Net

Canyelles

Canyelles © UrbanRail.Net Canyelles © UrbanRail.Net Canyelles © UrbanRail.Net Canyelles © UrbanRail.Net Canyelles © UrbanRail.Net

All photographs thanks to Ulrich Roth and his digital camera!

Robert at Canyelles © UrbanRail.Net

If you like these pictures and want to see more then get my book about Metros in Spain

Construction

Construction of L3 extension to Mundet near Valldaura station in June 2000

There are plans to extend this line from Canyelles to Trinitat Nova (L4).